• APRIL 2014-JUNE 2014

CLIENT: AES Barges Nigeria Limited
PROJECT: Underwater Visual Inspection, Submerged Bottom Cleaning and Wall Plates Thickness Measurement And Cleaning Of Anodes

  • MARCH 2014-MAY 2014

CLIENT: AES Barges Nigeria Limited
PROJECT: Refurbishment of Barge 205 Void Tank

  • JANUARY 2014

CLIENT: AES Barges Nigeria Limited
PROJECT: Removal of Collapsed Pile

  • OCTOBER 2013

CLIENT: Oryx Energies Nigeria
PROJECT: Circularity and Spatiality of Tanks 5 and 6

  • AUGUST 2013- JANUARY 2014

CLIENT: AES Barges Nigeria Limited
PROJECT: Refurbishment of Barge Pump Rooms on AES John Brown Units

  • JANUARY 2013

CLIENT: Waltersmith Petroman Oil Limited
PROJECT: Detailed Design of 8’’Pipeline at Assa-Ibigwe

  • NOVEMBER 2012- MARCH 2013

CLIENT: AES Barges Nigeria Limited
PROJECT: Refurbishment of Barge 203 Pump Room

  • SEPTEMBER 2012- OCTOBER 2012

CLIENT: Addax Petroleum Development Nig. Ltd
PROJECT: Diving Inspection of Caissons (G, I, K, M, N, & P Plus Caissons A, F, & O)

  • JUNE 2012

CLIENT: Addax Petroleum Development Nig. Ltd
PROJECT: Millerio Caissons Inspection

  • MARCH 2012- MARCH 2013

CLIENT: AGIP Energy and Natural Resources Limited
PROJECT: Agbara Platform Splash Zone Hydro Blasting and Coating

  • AUGUST 2011- DECEMBER 2012

CLIENT: Waltersmith Petroman Oil Ltd
PROJECT: Reverse Engineering and Detailed Design of 4’’Pipeline at Assa-Ibigwe.

  • JANUARY 2011- APRIL 2011

CLIENT: Addax Petroleum Development Nig. Ltd
PROJECT: Installation of Fenders at the Millerio and McIver Jetty

  • DECEMBER 2010- JANUARY 2011

CLIENT: Falck Prime Atlantic Limited
PROJECT: Repair of Fire Modules And Replacement of Hoist Beam

  • JUNE 2010- JULY 2010

CLIENT: Addax Petroleum Development Nig. Ltd
PROJECT: Diving Services for the Repairs of ADNH-4 to AND-B Pipeline

  • MARCH 2010- APRIL 2010

CLIENT: Addax Petroleum Development Nig. Ltd
PROJECT: Construction Diving Services in OML 123

  • SEPTEMBER 2009- MARCH 2010

CLIENT: AES Barges Nigeria Limited
PROJECT: Design, Procurement and Installation of Anodes on Nine

  • AUGUST 2009 – DECEMBER 2009

CLIENT: ASCON Oil Company LTD.
PROJECT: FEED AND DETAILED Design Of 3no X 8” Dia Schedule 40 Pipeline Bundle X 2km

  • JUNE 2009-MAY 2011

CLIENT: Second Adams Bitumen Development
PROJECT: Bitumen Development in Ijebu land , Feasibility Studies

  • DECEMBER 2008-JANUARY 2011

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Repair of Caisson C, H, and L Millerio Wharf Calabar

  • SEPTEMBER 2008- DECEMBER 2008

CLIENT: Addax Petroleum Development Nig. Ltd
PROJECT: Survey of McIver Jetty in Calabar

  • MAY- JUNE 2008

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Infill of Millerio Wharf Caisson ‘O’

  • MAY – JUNE 2006

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Repair of Millerio Wharf Caisson ‘F’

  • MARCH – MAY 2006

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Repair of Millerio Wharf Caisson ‘O’

  • OCTOBER 2005 – JANUARY 2006

CLIENT: Agip Petroleum Nig. Ltd / Amazon Energy.
PROJECT: Agbara Platforms Underwater Inspection.

  • JUNE 2005 – JULY 2006

CLIENT: Shell Nigeria Gas/ Kokun Integrated Services LTD.
PROJECT: Emergency Repairs/ Expansion of Agbara/Ota, Aba and Port-Harcourt Gas Networks.

  • AUGUST 2005 – MARCH 2006

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Repair of Millerio Wharf Caisson ‘J’

  • AUGUST – OCTOBER 2005

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Calabar river bed soil structural test and analysis

  • MARCH 2005

CLIENT: Prosafe Production
PROJECT: Logistic Support and Manpower Supply.

  • JULY 2004 – FEBRUARY 2005

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Repair of Millerio Wharf Caisson ‘A’

  • NOVEMBER – DECEMBER 2004

CLIENT: AES Nigeria Barge Ltd.
PROJECT: Underwater Inspection of Nine Power Barges

  • SEPTEMBER 2004

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Dive support for the construction of Mooring Dolphin

  • OCTOBER 2004

CLIENT: Management Enterprises Limited
PROJECT: Hydrographic Survey

  • AUGUST – SEPTEMBER 2004

CLIENT: Management Enterprises Limited
PROJECT: Inspection and Repair of Tin Can Jetty Sheet Piles

  • MAY – JULY 2004

CLIENT: Addax Petroleum Development Nig. Ltd.
PROJECT: Repair of Jetty Sheet Pile Wharf

  • MARCH 2004

CLIENT: Mobil Producing Nigeria / MSL Technologies Nig. Ltd.
PROJECT: QIT Jetty Integrity Survey

  • NOVEMBER 2003

CLIENT: Richtrade Merchandising Nig. Ltd.
PROJECT: Hydrographic Survey and Jetty Design (CAD)

  • OCTOBER– NOVEMBER 2003

CLIENT: PPMC / ZAKEEM OIL SERVE
PROJECT: Underwater Leak Repair

  • JULY – SEPTEMBER 2003

CLIENT: Shell Nigeria Gas / Willbros
PROJECT: 4”/6” Pipe line installation under Federal/State Highways and Company entrances

  • JANUARY 2003 – JUNE 2003

CLIENT: Domgas Nigeria Limited
PROJECT: Construction of 400m, 32mm gas pipeline by Electro fusion welding

  • AUGUST – NOVEMBER 2001

CLIENT: Shell Nigeria Gas / WESCO Engineering
PROJECT: Installation of 22no. Gas Customer Station

  • JULY 2001 – DECEMBER 2001

CLIENT: Shell Nigeria Gas/Dec Oil and Gas Limited
PROJECT: 4”/6” Pipe line installation under Federal/State Highways and company entrances

  • OCTOBER 2000 – JUNE 2000

CLIENT: Shell Nigeria Gas/Dec Oil and Gas Limited
PROJECT: 12” Thrust boring of Federal/State Highway

  • FEBRUARY – SEPTEMBER 1999

CLIENT: Voest Alpine/Tate & Lyle/Dangote Industries Ltd Nig. (Sugar Refinery)
PROJECT: Project Management inspection

  • SEPTEMBER 1999

CLIENT: Nivafer / Texaco Nigeria PLC
PROJECT: Hydro test of LPFO 8”, 6”, & 3” Truck receipt and Marine lines

  • AUGUST 1999

CLIENT: Dangote Industries Limited Nigeria (Sugar Refinery)
PROJECT: Hydro test of Pressure filters

  • AUGUST – OCTOBER 1998

CLIENT: Shell Petroleum Development Company Nigeria Limited
PROJECT: Marine facilities Maintenance and supply services

  • APRIL 1998

CLIENT: Shell Petroleum Development Company Nigeria Limited
PROJECT: Bonny SBM Sub-sea hose change

  • MARCH 1998

CLIENT: Shell Petroleum Development Company Nigeria Limited
PROJECT: Underwater repairs of ruptured 48” export line at Forcados Estuary

  • JANUARY 1998 – FEBRUARY 1998

CLIENT: Shell Petroleum Development Company Nigeria Limited
PROJECT: SBM Maintenance

  • MAY 1997 – DECEMBER 1997

CLIENT: Shell Petroleum Development Company Nigeria Limited
PROJECT: Forcados CLP refurbishment

  • JULY 1996 – SEPTEMBER 1996

CLIENT: Shell Petroleum Development Company
PROJECT: DPR Topside Inspection of Bonny CLP, KC Platforms and Opobo Platforms